Chatterley
Technology: Gas
Capacity: 20MW
This 8 generator project was constructed by Conrad in 2018 and is supplying fast response power to meet demand during peak periods and periods of generation shortfall.
Technology: Gas
Capacity: 20MW
This 8 generator project was constructed by Conrad in 2018 and is supplying fast response power to meet demand during peak periods and periods of generation shortfall.
Technology: Gas
Capacity: 6MW
This 3 generator plant is located in an active rural yard space to the east of the village of Matching Green. This project will generate sufficient local electricity for 3600 average homes.
Technology: Gas
Capacity: 6MW
This 3 generator project will be operational in summer 2019. It is co-located in an active haulage yard to the north of Calne. The project will provide flexible power to balance the local electricity network.